The Space Requirement for the pyrolysis line?

What’s the capacity range?
2006-02-20
Running power per hour?
2006-02-20

The workshop of pyrolysis section is 40m*15m*6m, which is excluding Big Cooling Tank Outside. The pyrolysis line also can be customized according to clients workshop space.